 |
|
 |
 |

Arctic Support Contract
Resource Library

FACILITIES & EQUIPMENT UPGRADES

Information at this location is for reference purposes. Nothing in this material should be construed as a firm requirement and the Government does not guarantee that the information provided is the most current. Material contained at this website is NOT a substitute for information provided on the Federal Business Opportunities (FedBizOpps) website at Arctic Research Support and Logistics Services (DACS11P2100). All official requirement documents will be posted at FedBizOpps.
If you are having trouble accessing any of these documents, contact the Division of Arctic Sciences, (703) 292-8029.
 |
Greenland |
 |
Greenland Inland Traverse
|
 |
Summit
CRREL documents:
- Thermal Conductivity and Durability Testing of Materials for Inflatable Buildings, in press. (PDF format, 1,249 KB)
- Engineering Assessment of Big House at Summit Station, Greenland, Full Report, in press (PDF format, 12,904 KB); Posted, 06/21/2011
- Engineering Assessment of Big House at Summit Station, Greenland, Draft Summary, in press (PDF format, 320 KB)
- Potable water supply feasibility study for Summit Station, Greenland, in press(PDF format, 4,204 KB)
NSF Documents:
- Summit Station: Basis of Design — Model 5 Station Concept Design (PDF format, 300 KB); Posted 08/10/2011
- Summit Station: Model 5 Station Concept Design — 3D view and architectural drawings (PDF format, 1,002 KB); Posted 03/04/2011
- Summit Station: Model Station Concept Design — Structural drawings (PDF format, 1,194 KB); Posted 03/04/2011
- Summit Station: Model 5 Electrical and Mechanical Drawings (PDF format, 1,657 KB); Posted 03/28/2011
- Summit Station: Basis of Design for the Atmospheric Watch Observatory, Based on the Summit Station Model 5 Basis of Design (PDF format, 114 KB); Posted 08/10/2011
- Summit Station Model 5 - Updated Environmental and Electrical Data (PDF format, 88 KB); Posted 08/16/2011
National Renewable Energy Laboratory:
|
 |
|
 |
Updated 08/16/2011 |
 |
|
 |
 |