text-only page produced automatically by LIFT Text
Transcoder Skip all navigation and go to page contentSkip top navigation and go to directorate navigationSkip top navigation and go to page navigation
National Science Foundation HomeNational Science Foundation - Directorate for Geological Sciences (GEO)
Polar Programs (PLR)
design element
Office of Polar Programs
SITE MAP!
Office of Polar Environment, Health and Safety
Division of Antarctic Sciences
Division of Antarctic Infrastructure and Logistics
PolarIce
United States Antarctic Program
OPP Advisory Committee
Antarctic Conservation Act
U.S. Antarctic Treaty Information Exchange
OPP Publications
Related Links
OPP-supported Workshops
Contacts
OPP Webmaster
bullet USAP Environmental Stewardship
bullet Comprehensive Environmental Evaluations
bullet U.S. Regulations Governing Antarctic Meteorites
Lists if IEE/EA, FONSI, and related environmental documents by fiscal year


List of IEE/EA, FONSI, And Related Environmental Documents for Fiscal Year 1995

  1. Summer Camp Upgrade for Fiscal Year 1995 at the Amundsen-Scott South Pole Station, Antarctica, signed October 11, 1994 [SPST9501.EAF]

  2. Cape Hallett Remediation, Phase II - Pollutant Removal, signed October 24, 1994 [MCFC9501.EAF]

  3. Vehicle Maintenance Facility Waste Water Improvement Project, McMurdo Station, Antarctica, signed October 24, 1994 [MCST9501.EAF]

  4. Truck Scale at McMurdo Station, Antarctica, signed October 24, 1994 [MCST9502.EAF]

  5. CATEGORICAL EXCLUSION - Morale, Welfare, and Recreation (MWR) Building Furnace Upgrade, McMurdo Station, Antarctica, signed October 24, 1994 [MCST9503.CE]

  6. Establishment of Twin Otter and Helicopter Fuel Caches for the 1994-1995 Season, signed October 24, 1994 [MCFC9502.EAF]

  7. Supplementary Environmental Information for Deep Ice Core Drilling at Vostok Station, Antarctica, singed October 24, 1994 [PGON9501.MEM]

  8. Issuance of Waste Permits for PolarFliteTM and Adventure Network International, signed October 24, 1994 [WPAN9501.EAF] (permits are attached to file)

  9. Geological Study within Seymour Island, Antarctica, signed November 15, 1994 [PLFC9501.EAF]

  10. Construction and Placement of a Sub-Surface Polar Solar Observatory for S-109B, Amundsen-Scott South Pole Station, Antarctica, signed November 16, 1994) SPDS9501.EAF]

  11. Relocating Two Electrical Substations and Increasing Emergency Fuel Storage Capacity at the Amundsen-Scott South Pole Station, Antarctica, signed November 17, 1994 [SPST9502.EAF]

  12. Continued Implementation of Hydrologic Investigations in the Dry Valleys - Project S-042, signed November 17, 1994 [MCDV9501.EAF]

  13. Management of Long Duration Heavy-Lift Balloon Flights in Antarctica, signed November 22, 1994 by NSF and NASA [MCAN9501.EAF]

  14. Deployment of a New Air Shower Array (SPASE-2) and Data Acquisition Building Amundsen-Scott South Pole Station, Antarctica, signed November 23, 1994 [SPDS9502.EAF]

  15. Improvements to the Existing Explosives Storage Area, McMurdo Station, Antarctica, signed November 30, 1994 [MCST9504.EAF]

  16. Installation of an Antenna Tower for the Fuel Tank Alarm System at McMurdo Station, Antarctica, signed December 5, 1994 [MCST9505.EAF]

  17. Automated Weather Station Installation, Hugo Island, signed December 9, 1994 [PLFC9502.EAF]

  18. Clearing Ice Blockages Within the Dry Valley Drilling Project Boreholes, signed December 13, 1994 [MCDV9502.EAF]

  19. Amendment No. 1, Establishment of Twin Otter and Helicopter Fuel Caches for the 1994-1995 Season, signed December 13, 1994 [MCFC9503.AM1]

  20. Finding (Updated). Increase in Maximum Allowable Daily Discharge Rate from McMurdo Station Sanitary Waste Disposal Facility, signed December 14, 1994 [MCST9506.FON]

  21. Import and Use of Gravel Fill Material at Palmer Station, Antarctica, signed January 3, 1995 [PLST9501.EAF]

  22. Amendment No. 1, Fuel Storage Upgrade at Marble Point, Antarctica, signed January 6, 1995 [MCMP9501.AM1]

  23. Issuance of a Waste Permit for 1995 Antarctic Expedition, Mr. Bob McConnel, Team Leader, signed January 9, 1995 [WPFC9501.EAF]

  24. Establishment of Fuel Cache at McGregor Glacier, signed January 11, 1995 [MCFC9504.EAF]

  25. Recovery of a Long Duration, Heavy-Lift Balloon and Payload - Supplementary Environmental Information, signed January 18, 1995 [MCAN9501.MEM]

  26. Pier Repair and Corrosion Protection at Palmer Station, Antarctica, signed February 2, 1995 [PLST9502.EAF]

  27. Amendment No. 1 to the Environmental Document: IEE for the Proposed Replacement, Operation, and Decommissioning of Ice Wharves at McMurdo Station, Antarctica, May 23, 1992, signed February 13, 1995 [MCST9507.AM1]

  28. Installation and Maintenance Procedures for the Antarctic Automatic Weather Station Program, signed February 23, 1995 [PGAN9501.EAF]

  29. Amendment No. 1, Pier Repair and Corrosion Protection at Palmer Station, Antarctica, signed April 4, 1995 [PLST9502.AM1]

  30. UNOFFICIAL NEPA COMPLIANCE GUIDE, April 11, 1995 [PGAN9502.MEM]

  31. FONSI - Use of the Upstream Bravo Camp, Antarctica for Ice Drilling During the 1995-1996 Field Season, signed May 4, 1995 [MCFC9505.FON]

  32. Categorical Exclusion. Micrometeorite Collection in the Rodriguez Well at the Amundsen-Scott South Pole Station, Antarctica, signed July 31, 1995 [SPST95O3.CE]

  33. Removal of Ice Cornice Safety Hazard, McMurdo Station Antarctica, signed August 7, 1995 [MCST9508.EAF]

  34. Amendment No. 1. Construction of a Mobile Runway Facility to Support Air Operations at Williams Field and the Sea Ice Runway McMurdo Station, Antarctica, signed August 7, 1995 [MCWF9501.AM1]

  35. Installation of Medium Frequency Radar for Studies of Large-Scale Middle Atmospheric Dynamics in the Antarctic (S-113), at McMurdo Station, Antarctica, signed August 14, 1995 [MCST9509.EAF]

  36. Byrd Surface Camp, Antarctica, Proposed Addition, signed August 16, 1995 [MCFC9506.EAF]

  37. Relocation of the Meteorological (MET) Tower Amundsen-Scott South Pole Station, Antarctica, signed August 16, 1995 [SPST9504.EAF]

  38. AMENDMENT No. 1. Completion of AMANDA and Development of Second-Generation Antarctic Muon and Neutrino Detector Array: AMANDA-Mark II at Amundsen-Scott South Pole Station, Antarctica, signed August 22, 1995 [SPDS9503.AM1]

  39. Management of Unreliable and Unsafe Explosives in Antarctica, signed August 23, 1995 [PGAN9503.EAF]

  40. All-Terrain Vehicle Use at Lake Hoare, Antarctica, signed August 25, 1995 [MCDV9503.EAF]

  41. Categorical Exclusion: Replacement of Sewer Bulb at the Amundsen-Scott South Pole Station, Antarctica, signed August 28, 1995 [SPST9505.CE]

  42. Amendment 2: Establishment of Twin Otter and Helicopter Fuel Depots for the 1995-96 Season, signed August 28, 1995 [MCFC9507.AM2]

  43. Issuance of Waste Permits to Adventure Network International and Mr. Skip Novak, Owner and Operator of the Pelagic, signed September 7, 1995 [WPAN9502.EAF]

  44. Placement of a McMurdo Tracking and Data Relay Satellite (TDRS) Relay System (MTRS) in Antarctica, signed September 8, 1995 [MCST9510.EAF]

  45. Replacement Garage for the Amundsen-Scott South Pole Station, Antarctica, signed September 11, 1995 [SPST9506.EAF]

 