Section VIII details the number and type
transportation facilities and communications equipment for use within the
Antarctic treaty area.
Surface, Marine, and Air Transportation Vehicles
McMurdo Station
|
Truck, (light and heavy) |
106 |
|
Carrier, Personnel and Cargo (tracked and wheeled) |
43 |
|
Trailer, (tracked and wheeled) |
39 |
|
Front-end loader, bucket and forklift |
45 |
|
Forklift, warehouse |
20 |
|
Motor toboggans |
90 |
|
Crane |
2 |
|
Road grader |
4 |
|
Roller |
4 |
|
Tractor, crawler |
25 |
|
Tractor, wheeled |
2 |
|
Sweeper, magnet |
1 |
|
Snow plane |
6 |
|
Truck, fire, pumper |
8 |
|
Trencher |
2 |
|
Aircraft, LC-130 |
6 |
|
Helicopters, Aerospatiale AS-350B-2 |
3 |
|
Helicopters, Bell 212 |
1 |
|
Hovercraft |
1 |
|
Scraper |
2 |
|
Backhoe |
2 |
Amundsen-Scott South Pole Station
|
Cranes |
3 |
|
Front Loader, tracked |
7 |
|
Motor Toboggans |
2 |
|
Personnel Carrier |
5 |
|
Snow Plane |
2 |
|
Tractor Crawler |
3 |
|
Truck, light and heavy |
2 |
Palmer Station
|
Front-loader (wheeled) |
2 |
|
Motor toboggans |
2 |
|
Crane, wheel mounted |
1 |
|
Boats, rubber (Zodiac) |
16 |
|
Forklift, all terrain |
1 |
|
Telescopic material handler |
1 |
|
Vehicle, all terrain, 4-wheel |
2 |
Description of Communications Facilities
- For information of frequencies see attached forms at end of this section.
The following projects are contemplated for the FY98-99 season in Antarctica.
McMurdo Station
- Implement modifications to portable repeater power systems.
- Install Base radio at T-site for ANG requirements.
- Install new Helo Flight Following station for ATS in Bldg. 165.
- Install VHF base radio in Crary Lab Rm. 213.
- Install Microwave radio equipment for MRSF and LDB.
- Install CoastCom channel banks and signal conditioning equipment for MRSF ANG HF remote control to T-site.
- Install Pairgain equipment at Williams Field for AB-145-0 support.
- Install and configure new DEC Prioris file server to replace MCM2.
- Install and implement new SIMS e-mail system to replace DaVinci and Unix e-mail accounts.
- Install 10 GPS units in Sprites for BFC.
- Receive and install 2 refurbished AN/FRT-83 transmitters for T-site.
- Stage, install, and test prototype GOES-3 satellite communications system for field camp use.
- Install remote HF radio equipment for ANG at Ice Tower.
- Erect 3 antenna towers at big Razorback for S-009.
- Install, configure, and support the NYANG's new computer equipment and meet their operational requirements.
- Terminate 36-MM fiber optic cable for MGS-AH/CRARY.
- Install 24/12 composite fiber optic cable for MGS-AH/CRARY.
- Install 24/12 composite fiber optic cable for MGS-AH/AH B-197.
- Install SW56 terminal selection switch in AFRTS studio.
- Install 2 DEC Prioris Servers to complete the server life cycle replacement.
South Pole Station
- Replace the GOES-3 antenna controller, and upgrade the antenna systems.
- Relocate the GOES-3 and LES-9 controller and preamplifiers from the first floor communications closet to the second floor TDRSS satellite operations room.
- Install new 12 pair telephone cables from the new TACAN location to Building 68 IDF.
- Install telephone and LAN landlines from the NSF office to the Construction Office network concentrator and the telephone IDF.
- Install backup Windows NT Exchange server.
- Complete all LAN, telephone, fire alarm, and CCTV installations required for the new Garage facility, and the new fuel arch upgrades.
Palmer Station
- Replace HF transceivers.
- Replace ATS-3 communications system.
- Install backup Windows NT Exchange server.
- Upgrade communication and data system equipment space.
- Install the necessary telephone and network hardware, cabling, and terminal connections to BIOMED and GWR spaces.
Description of Airfields
McMurdo Station
Air Facilities
- Williams Field - 10,000 ft. and 8,000 ft. skiways on ice shelf.
- 10,000 ft. and 8,000 ft. ice runways (on annual sea ice)
- Helicopter landing pad.
Crash Equipment
- Two Canadian Foremost Chieftains, 1200 gallons AFFF (ea)
- Two Nodwell Flex-Trac equipped with 1350 lb. PKP, 200 gallon AFFF
- One Nodwell Flex-Trac equipped with 3,000 lb. PKP
- Seven 150 lb. PKP sled-mounted extinguisher on the flight line
- Two 3,000 lb. PKP sled-mounted extinguishers at the heli-pad
- One Pumper/Tanker, 3,400 gallons of water.
- Two Pumpers, 750 gallons (H2O), 1000 GPM
Navigation Aids
- Precision (course & glide slope) Approach Radar (PAR) and Approach Surveillance Radar (ASR) on primary landing runways, AN/FPN-36 radar.
- AN/TRN-26 TACAN.
- AN/URN-25 TACAN
- T-1109/GRT-22 UHF radio beacon.
- Terminal Approach Control Radar (GPN-27)
- Precision Approach Path Indicator (PAPI)
- A Mobile Microwave Landing System (MMLS) will be installed for testing during the early Austral Summer.
Amundsen-Scott South Pole Station
Air Facilities
14,000 ft. skiway
Crash Equipment
Three 350 lb. dry chemical units
Navigation Aids
- PAR and ASR radar, AN/FPN-36.
- AN/URN-25 TACAN.
- T-1109/GRT-22 UHF beacon.
Palmer Station
Air Facilities
None. Open field landings on glacier possible.
Crash Equipment
None
Navigation Aids
T-1109/GRT-22 UHF beacon.
Marble Point Camp
Air Facilities
One helicopter landing pad.
Crash Equipment
- One 350 lb. dry chemical unit.
- One 150 lb. dry chemical unit (PKP).
Navigation Aids
None.
|