Appendix I Environmental Assessments - 1998-97 Plans

Appendix I of the Activities Planned for 1998-99 lists the Initial Environmental Evaluation/Environmental Assessments from October 1, 1997- September 30, 1998.

  1. Adoption Of Standard Operating Procedures For Placement, Management, And Removal Of Materials Cached At Field Locations for the United States Antarctic Program [PGFC9801.EAF].
  2. Improving the Bulk Fuel Storage System at McMurdo Station, Antarctica, [MCST9801.EAF].
  3. Relocating and Increasing the Capacity of Summer Camp at Amundsen-Scott South Pole Station, Antarctica, [SPST9801.EAF].
  4. Removal of Geophysical Sampling Equipment at Don Juan Pond [77° 34’S, 161° 11’E] Wright Valley and Site Reclamation at Lake Vida [77° 23’S, 161° 57’E] Victoria Valley, Antarctica, [MCDV9801.EAF].
  5. Modifications to Ongoing Hydrologic Data Collection in the McMurdo Dry Valleys, Antarctica [MCDV9802.EAF]

PreviousBack to Table of ContentsNextSearchDownloadMore InformationTreaty Homewww.nsf.govOPP Home